Return to all projectsASPİLSAN Energy
Military Battery Management System & 5.1 kWh Pack
BMS boards with cell monitoring, balancing, protection and CAN for ASELSAN’s DERİNGÖZ program, qualified to MIL-STD-461 and MIL-STD-810.
This is a defense program; only publicly available, high-level information is shared here.
Overview
At ASPİLSAN Energy I worked on the Battery Management System (BMS) and 5.1 kWh battery pack developed for ASELSAN’s DERİNGÖZ program.
What I did
- Designed BMS boards of up to 8 layers covering cell monitoring, cell balancing, protection and CAN communication.
- Planned and ran MIL-STD-461 (EMI/EMC) and MIL-STD-810 (environmental) qualification tests.
- Closed test findings through layout, filtering and shielding revisions.
- Prepared the verification and test documentation.
Before that: associate engineer
From March to September 2023 I evaluated and compared domestic and COTS BMS solutions and contributed to multilayer PCB designs in Altium Designer.